The installation and lap method of colored stone metal tile
can meet the construction requirements of large slope roof arc roofs, and the metal tiles have small dead weight,
convenient vertical transportation, low construction loss, short construction period, and high safety performance.
They are suitable for large slope roofs and arc roof constructions and can meet high requirements.
Construction requirements for complex roofing with quality shapes.
Color stone metal tile lap method
The overlapping of colored stone metal tiles can be from left to right or from right to left, all interlocking.
However, the overlapping part should face away from the prevailing wind direction,
rainwater flow direction, or rainwater drain pipe and roof gutter.
The order of paving is generally from bottom to top from the cornice to the ridge. Color stone metal tile paving nailing and fixing.
At the front edge of the colored stone metal tile,
use the mounting nails to fix the colored stone metal tile on the hanging tile.
and the center of the overlapped tile arc of the covered colored stone metal tile is close to the covered metal tile by 60mm Fix it with nails.
Each tile should be fixed with 7 mounting nails.
Nailing technology of colored stone metal tile paving
When installing, you should stand on the wooden keel where the tiles overlap,
facing the cornice, nail the tiles, and the nail gun can also fix the tiles.
The installation steps of the roofing at the gable of the colored stone metal tile
Starting from the second row at the top of the roof, horizontally install colored stone metal tiles from
one end to the other end of the gable wall.
The installation steps of the color stone metal tile roof at the sloping ridge
On the second row of the roof, start to lay tiles 150mm away from the sloping roof ridge board,
and then continue to lay to the other end until a complete piece of colored stone metal tile has been laid.
Make sure to firmly fix the back edge of the tiles,
and install only the two rows of tiles down each time, and their starting positions are the same.
For the joint part of the roof and the vertical wall,
It should bend the tiles on the side of the wall and cover it with the flooding edge.
The distance from a complete tile closer to the vertical wall to the vertical wall is, To determine the bend line.
Add 40mm as the cutting line. Cut and bend the tiles.
When installing the ridge tiles of the colored stone metal tiles, they should be overlapped along the high-frequency wind direction,
the colored stone metal tiles on the two slopes should be fully overlapped,
and the overlap width should not be less than 50mm.
The eaves should be straight, and the gaps between the ridge tiles and the gaps between the ridge tiles and the flat tiles,
and the gaps between the oblique ditch tiles and the drainage ditch should be filled and smoothed with mortar and sealed tightly.
The hanging tiles should be flat, closely overlapping, horizontal, and vertical.
The eaves of the eaves should be of the same size, and the eaves should be straight and neat.
The color stone metal tiles of flat roofs shall not have defects such as missing corners, sand holes, cracks, and warping openings.
The paved roof shall not penetrate water.